A time drain slide that shows where one person's 40-hour week goes. The top holds the finding as a sentence with its source, and the hours lost outside core work as an oversized number on the right. In the middle, the 40 hours are split into five horizontal segments sized by hours, with an "outside core" bracket over the four drain segments. Below, the four drains are numbered to match the bar, each with a one-line cause, and a closing strip annualizes the hours and cost.
🔗 Markdown URL
https://getdeck.co/api/md/problem-time-drain-week--cobalt-grid.md?lang=en&key=YOUR_KEYFetching your key...
⚡ MCP install command
Client
claude mcp add --transport http getdeck https://getdeck.co/api/mcp
Fetching your key...
Paste this into your terminal to connect your local AI agent to getdeck.
Best for: Problem slides in B2B SaaS pitch decks, proposals for automation or collaboration tools, operations efficiency diagnostics, internal process improvement reports, sharing time-tracking or survey results
Use: Use it to show, with measured numbers, how much of a person's or team's working week leaks outside core work. It fits when a 40-hour week splits into one core segment and four drains, each with a one-line cause. Bar length shows share, the right-hand number the total drain, and the bottom strip the yearly cost. Good as the problem slide for an automation or tooling proposal.
Avoid: To show friction in time order through a day use problem-day-in-the-life; to point at the seams between tools use problem-tool-sprawl-seams; for cost that grows the longer it is ignored use problem-cost-of-inaction. It does not fit estimates without measurement, or three or fewer, or five or more, drains.
Based on the currently selected theme Cobalt Grid. Switching the theme in the sidebar updates this section too.
Not used in any deck template yet.