getdeck
← Back to listproblem-wait-time-waste
✦layout.md

Problem - Wait Time Waste.

A value stream problem slide showing that a request spends only a few hours being worked on across five steps and the rest waiting between them. A label and one-line takeaway sit at the top. Five step boxes stand in a row with the wait time written over a dashed line between each pair. In the middle, the same sequence is drawn to scale as one bar: work is a thin accent sliver and waiting is a wide grey block labelled with its duration. At the bottom, lead time, hands-on time and flow efficiency stand as three numbers split by hairlines, only the efficiency number gets an accent left bar, and a two-line conclusion sits to the right.

🔗 Markdown URL

https://getdeck.co/api/md/problem-wait-time-waste--cobalt-grid.md?lang=en&key=YOUR_KEY

Fetching your key...

⚡ MCP install command

Client

claude mcp add --transport http getdeck https://getdeck.co/api/mcp

Fetching your key...

Paste this into your terminal to connect your local AI agent to getdeck.

Upgrade to Pro for more powerful MCP access →

02

Preview

01

Overview

Best for: Operations improvement proposals, the problem slide of an automation or workflow tool sales deck, delivery lead time reviews, explaining onboarding delays, lean and six sigma improvement reports

Use: Use it to prove with numbers that work takes long because it waits between steps, not because the work is slow. Five steps with their waits, the same flow drawn to scale, and lead time, hands-on time and flow efficiency fit on one slide. Fits operations proposals, the problem slide of an automation pitch, delivery lead time reviews and onboarding delay analysis.

Avoid: For how one person spends a week use problem-time-drain-week, for the cost of doing nothing use problem-cost-of-inaction, and when the problem is the seams between tools use problem-tool-sprawl-seams. To explain the steps themselves use a process layout. It does not fit when there are not five steps or work and wait time cannot be measured separately.

CategoryProblem / Solution
DensityMedium
Text Budget220 chars
EmphasisVisual
PositionMiddle
03

Theme

Based on the currently selected theme Cobalt Grid. Switching the theme in the sidebar updates this section too.

SchemeLight
Best forAcademic reports, trend reports, design research, agency capabilities
Avoid forCasual, colorful presentations
04

Slots (28)

eyebrow
Label
Process and measurement basis (Contract change requests · 90-day median)26 chars
titleRequired
Aa
One-line takeaway (Nine days from request to done, six hours of actual work)30 chars
step1_nameRequired
Label
Step 1 name (Intake)8 chars
step1_timeRequired
Label
Hands-on time for step 1 (1.5h of work)9 chars
step2_nameRequired
Label
Step 2 name (Legal review)8 chars
step2_timeRequired
Label
Hands-on time for step 2 (2h of work)9 chars
step3_nameRequired
Label
Step 3 name (Manager approval)8 chars
step3_timeRequired
Label
Hands-on time for step 3 (30m of work)9 chars
step4_nameRequired
Label
Step 4 name (System update)8 chars
step4_timeRequired
Label
Hands-on time for step 4 (1.5h of work)9 chars
step5_nameRequired
Label
Step 5 name (Customer notice)8 chars
step5_timeRequired
Label
Hands-on time for step 5 (30m of work)9 chars
wait1_timeRequired
Label
Wait after step 1 (2 days waiting)7 chars
wait2_timeRequired
Label
Wait after step 2 (3 days waiting)7 chars
wait3_timeRequired
Label
Wait after step 3 (1 day waiting)7 chars
wait4_timeRequired
Label
Wait after step 4 (3 days waiting)7 chars
bar_caption
Label
Caption for the time bar (The same 222 hours drawn to scale)22 chars
legend_work
Label
Work legend (Work)4 chars
legend_wait
Label
Wait legend (Waiting)4 chars
lead_valueRequired
128%
Lead time value (9.3 days)6 chars
lead_labelRequired
Label
Lead time label (Lead time)10 chars
work_valueRequired
128%
Total hands-on time (6 hours)6 chars
work_labelRequired
Label
Work time label (Hands-on time)10 chars
efficiency_valueRequired
128%
Flow efficiency, work ÷ lead time (2.7%)6 chars
efficiency_labelRequired
Label
Efficiency label (Flow efficiency (work ÷ lead time))20 chars
takeaway
Two-line conclusion (Cutting the waits between steps shrinks lead time far more than working faster)44 chars
company
Label
Company name (Nova Operations)20 chars
page
Label
Page number (4)4 chars
05

Style Knobs (1)

Title sizefontSize
Aa
font-size52–64px (step 4)
06

Used in these deck templates

Not used in any deck template yet.