getdeck
← Back to listprocess-double-diamond
✦layout.md

Process - Double Diamond.

A Double Diamond slide that draws widening and narrowing on the problem, then on the solution, as two diamonds. Discover, Define, Develop and Deliver sit inside the diamonds, and the agreed problem statement stands largest at the waist where the diamonds meet. The two ends carry the starting question and the result, and four columns below, matched to the four diamond halves, list each phase's timing, activities and output.

🔗 Markdown URL

https://getdeck.co/api/md/process-double-diamond--cobalt-grid.md?lang=en&key=YOUR_KEY

Fetching your key...

⚡ MCP install command

Client

claude mcp add --transport http getdeck https://getdeck.co/api/mcp

Fetching your key...

Paste this into your terminal to connect your local AI agent to getdeck.

Upgrade to Pro for more powerful MCP access →

02

Preview

01

Overview

Best for: Reporting product or service improvement projects, explaining a design process, introducing a consulting method, explaining why research took as long as it did

Use: Use it to explain why you researched before building. The widening and narrowing shape shows which stretches explored and which decided, and the problem statement at the waist makes it obvious what the project agreed to solve. The four columns below back it up with timing and outputs per phase.

Avoid: For phase order alone, use flow-stages-4; when approval gates are the point, use process-stage-gate; for a falling count across steps, use process-funnel. It does not fit projects without four phases, or where the problem cannot be stated in one sentence.

CategoryProcess / Flow
DensityHigh
Text Budget220 chars
EmphasisVisual
PositionMiddle
03

Theme

Based on the currently selected theme Cobalt Grid. Switching the theme in the sidebar updates this section too.

SchemeLight
Best forAcademic reports, trend reports, design research, agency capabilities
Avoid forCasual, colorful presentations
04

Slots (34)

eyebrow
Label
Project name and duration (Onboarding revamp · Double Diamond · 10 weeks)32 chars
titleRequired
Aa
One-line conclusion about the process (Four weeks to define the problem, six to narrow the solution)28 chars
start_label
Label
Name of the left end point (Starting question)8 chars
start_textRequired
The question that started the project, two lines at most (Why do half leave in week one)14 chars
define_label
Label
Name of the middle point (Agreed problem definition)12 chars
define_textRequired
Aa
One agreed problem statement, two lines at most (Help new customers stuck at data connection see a first report within 10 minutes)36 chars
end_label
Label
Name of the right end point (Result)8 chars
end_textRequired
What the project shipped, two lines at most (Guided onboarding shipped)14 chars
phase1_nameRequired
Aa
Phase name, one short word (Discover)4 chars
phase1_mode
Label
What this phase does, as a verb (Listen widely)9 chars
phase2_nameRequired
Aa
Phase name, one short word (Define)4 chars
phase2_mode
Label
What this phase does, as a verb (Narrow to one)9 chars
phase3_nameRequired
Aa
Phase name, one short word (Develop)4 chars
phase3_mode
Label
What this phase does, as a verb (Build several options)9 chars
phase4_nameRequired
Aa
Phase name, one short word (Deliver)4 chars
phase4_mode
Label
What this phase does, as a verb (Ship only one)9 chars
phase1_period
Label
Discover phase timing (Weeks 1-3)10 chars
phase1_itemsRequired
Three Discover activities, about 20 characters each (18 customer interviews, etc.)48 chars
phase1_output_label
Label
Name of the result row (Output)6 chars
phase1_outputRequired
Label
The one thing this phase produced (42 insights)12 chars
phase2_period
Label
Define phase timing (Week 4)10 chars
phase2_itemsRequired
Three Define activities, about 20 characters each (Compare 3 problem statements, etc.)48 chars
phase2_output_label
Label
Name of the result row (Output)6 chars
phase2_outputRequired
Label
The one thing this phase produced (One-page problem statement)12 chars
phase3_period
Label
Develop phase timing (Weeks 5-8)10 chars
phase3_itemsRequired
Three Develop activities, about 20 characters each (Build 3 prototypes, etc.)48 chars
phase3_output_label
Label
Name of the result row (Output)6 chars
phase3_outputRequired
Label
The one thing this phase produced (One validated option)12 chars
phase4_period
Label
Deliver phase timing (Weeks 9-10)10 chars
phase4_itemsRequired
Three Deliver activities, about 20 characters each (Roll out to 20% first, etc.)48 chars
phase4_output_label
Label
Name of the result row (Output)6 chars
phase4_outputRequired
Label
The one thing this phase produced (Week-one churn down 31%)12 chars
company
Label
Company or team name18 chars
page
Label
Page number4 chars
05

Style Knobs (2)

Title sizefontSize
Aa
font-size44–60px (step 4)
Problem statement sizefontSize
Aa
font-size24–28px (step 2)
06

Used in these deck templates

Not used in any deck template yet.