getdeck
← Back to listprocess-sipoc-scope
✦layout.md

Process - SIPOC Scope.

A SIPOC diagram that pins down what sits outside a process rather than inside it. Five columns run left to right as Suppliers / Inputs / Process / Outputs / Customers, and only the center Process column is given dominance: 28% of the width, a top accent rule three times the weight of the others, and four numbered high-level steps. A boundary strip is welded into the header declaring the start trigger and the end point, so the scope is pinned down before anything else is read, and one closing line at the bottom states what was deliberately left out. The four flow markers between columns are border-trick triangles, so the left-to-right reading direction survives even where color cannot be trusted.

🔗 Markdown URL

https://getdeck.co/api/md/process-sipoc-scope--cobalt-grid.md?lang=en&key=YOUR_KEY

Fetching your key...

⚡ MCP install command

Client

claude mcp add --transport http getdeck https://getdeck.co/api/mcp --header "Authorization: Bearer gd_..."

Fetching your key...

Paste this into your terminal to connect your local AI agent to getdeck.

Upgrade to Pro for more powerful MCP access →

02

Preview

01

Overview

Best for: Agreeing scope at a process-improvement kickoff, the Define-stage deliverable in DMAIC, fixing process boundaries before any detailed map is drawn, identifying upstream suppliers and downstream customers, a scope-creep agreement on the record

Use: When a process-improvement effort is opening and the first thing to agree is where the process starts and where it ends. This is the picture Lean Six Sigma draws in the Define stage before any detailed map, and the one that blocks scope creep by putting the boundary on the record at kickoff. Fill it from the middle out: fix four or fewer high-level steps first, then the outputs they produce and the customers who receive them, then work backwards to the inputs required and the suppliers who feed them. Write every cell as a short noun phrase rather than a sentence, since the columns have to stay narrow enough for all five to fit one screen. Always fill the start and end of the boundary strip, because that declaration is the reason this picture exists, and use the closing line to name what was pushed out of scope so it cannot be argued later.

Avoid: Use process-swim-lane to split the steps inside a process across roles (its horizontal axis is elapsed time, leaving no room for actors outside the process), process-raci-matrix to assign R/A/C/I responsibility per task (it carries neither input/output cells nor a start/end declaration), process-stage-gate when the exit criteria between stages are the subject (it has no columns naming upstream suppliers or downstream customers), process-relay-handoff for baton passes between teams (every handoff sits inside the organization, so all four legs belong inside the Process column rather than at the S and C ends), flow-stages-4 or process-timeline-steps to merely list the steps (neither has slots for what each step consumes or produces), diagram-flow-architecture for data links between system components (the actors are systems, not organizations), diagram-customer-journey-map for stage-by-stage experience from the customer side (the supply side is missing entirely, so both boundaries cannot be set at once), and outline-scope-boundary to set what a talk or project will and will not cover (that is agenda scope, not a supply-to-demand chain, and it has no center process column). Skip it for a procedure manual that needs many detailed steps, since the cells will not hold them.

CategoryProcess / Flow
DensityHigh
Text Budget300 chars
EmphasisVisual
PositionMiddle
03

Theme

Based on the currently selected theme Cobalt Grid. Switching the theme in the sidebar updates this section too.

SchemeLight
Best forAcademic reports, trend reports, design research, agency capabilities
Avoid forCasual, colorful presentations
04

Slots (31)

eyebrow
Label
Top label (PROCESS SCOPE)20 chars
titleRequired
Aa
One-line conclusion pinning down how far this process scope runs42 chars
boundary_labelRequired
Label
Label for the boundary strip (Boundary)6 chars
boundary_startRequired
Label
The trigger that opens the process. Write it as an event (PO received)18 chars
boundary_endRequired
Label
Where the process ends. Anything past it is out of scope (revenue settled)18 chars
col_s_labelRequired
Label
Header of column 1 (Suppliers). The five SIPOC words are the framework, so keep them by default12 chars
col_i_labelRequired
Label
Header of column 2 (Inputs)12 chars
col_p_labelRequired
Label
Header of the center column (Process)12 chars
col_o_labelRequired
Label
Header of column 4 (Outputs)12 chars
col_c_labelRequired
Label
Header of column 5 (Customers)12 chars
sup1Required
Label
Supplier 1 that feeds the inputs. Name the organization or actor only14 chars
sup2Required
Label
Supplier 214 chars
sup3
Label
Supplier 3. Two entries are fine if the third is empty14 chars
in1Required
Label
Input 1 entering the process. A short noun phrase, not a sentence14 chars
in2Required
Label
Input 214 chars
in3
Label
Input 314 chars
process_nameRequired
Label
Name of the process the center column covers, spanning its start and end20 chars
step1Required
Label
High-level step 1. A grouped major step, not a detailed procedure16 chars
step2Required
Label
High-level step 216 chars
step3Required
Label
High-level step 316 chars
step4
Label
High-level step 4. Past five steps, group them back down to four16 chars
out1Required
Label
Output 1 the process produces. Keep it paired with the inputs14 chars
out2Required
Label
Output 214 chars
out3
Label
Output 314 chars
cus1Required
Label
Customer 1 receiving the outputs. It has to be an actor outside the process14 chars
cus2Required
Label
Customer 214 chars
cus3
Label
Customer 314 chars
note_labelRequired
Label
Label for the closing agreement line (Agreed)6 chars
note_textRequired
One line pinning down what is out of scope. This is the sentence that blocks scope creep60 chars
company
Label
Company name (footer)20 chars
page
Label
Page number5 chars
05

Style Knobs (3)

Process column emphasisvariant
보더만 (기본)면
data-variant보더만 (기본) / 면
Flow marker colorcolor
coloraccent / border-strong / ink-muted
Headline sizefontSize
Aa
font-size28–46px (step 2)
06

Used in these deck templates

Not used in any deck template yet.