getdeck
← Back to listtimeline-release-train
✦layout.md

Timeline - Release Train.

A timeline that staggers four fixed-cadence release trains on one time axis, one cycle apart. Six two-week ticks and a dashed today line run across the top, and every train is the same-length bar split into a build phase, a feature-freeze diamond, a QA phase and a ship dot, so the repeating gates are visible at a glance. Only the next train to leave is drawn in the accent color, and two columns below list what boarded this train and what missed the freeze and moved to the next one.

🔗 Markdown URL

https://getdeck.co/api/md/timeline-release-train--cobalt-grid.md?lang=en&key=YOUR_KEY

Fetching your key...

⚡ MCP install command

Client

claude mcp add --transport http getdeck https://getdeck.co/api/mcp

Fetching your key...

Paste this into your terminal to connect your local AI agent to getdeck.

Upgrade to Pro for more powerful MCP access →

02

Preview

01

Overview

Best for: Engineering and product operations reports, sharing release dates with customers, mobile app release cadence, deployment schedules inside quarterly plans, SAFe PI planning summaries

Use: Use it when a team that ships on a fixed cadence wants to show the next few releases on one slide. Every train repeats the same shape (build, freeze, QA, ship), so readers see when each one freezes and ships and can extrapolate the next. The two columns below show what boarded and what missed the freeze, which makes the 'missed features take the next train' rule concrete.

Avoid: For tasks of different lengths, use timeline-gantt; for different workstreams side by side, use timeline-parallel-tracks; to count down to a single launch, use timeline-countdown-launch. If the cadence is irregular, the repeating-shape advantage disappears.

CategoryTimeline
DensityMedium
Text Budget220 chars
EmphasisVisual
PositionMiddle
03

Theme

Based on the currently selected theme Cobalt Grid. Switching the theme in the sidebar updates this section too.

SchemeLight
Best forAcademic reports, trend reports, design research, agency capabilities
Avoid forCasual, colorful presentations
04

Slots (28)

eyebrow
Label
Topic and cadence (Release train · Every other Tuesday)18 chars
titleRequired
Aa
One-line train rule (Features that miss the freeze take the next train)22 chars
date1Required
Label
Tick date; one column is one cycle (10/20, then every two weeks)5 chars
date2Required
Label
Tick 2 date5 chars
date3Required
Label
Tick 3 date5 chars
date4Required
Label
Tick 4 date5 chars
date5Required
Label
Tick 5 date5 chars
date6Required
Label
Tick 6 date5 chars
today_label
Label
Today marker (Today 11/4). Line position is the --rlt-today-at ratio on today-line8 chars
train1_tag
Label
Marker for the next train to leave (Next train)6 chars
train1_nameRequired
Label
Version name (v4.8). Only this row is drawn in the accent color6 chars
train1_shipRequired
Label
Ship date (Ships 12/1), matching the dot at the end of the bar8 chars
train2_nameRequired
Label
Train 2 version6 chars
train2_shipRequired
Label
Ship date8 chars
train3_name
Label
Train 3 version6 chars
train3_ship
Label
Ship date8 chars
train4_name
Label
Train 4 version6 chars
train4_ship
Label
Ship date8 chars
legend_dev
Label
Legend: build phase (Build 4 wks)8 chars
legend_freeze
Label
Legend: freeze diamond (Feature freeze)8 chars
legend_qa
Label
Legend: QA phase (QA · Hardening 2 wks)10 chars
legend_ship
Label
Legend: ship dot (Ship)6 chars
boarding_titleRequired
Label
Title for features on this train (On board v4.8)14 chars
boarding_listRequired
Three features on this train, 12 chars each40 chars
deferred_title
Label
Title for deferred features (Moved to the next train)14 chars
deferred_list
Two features that missed the freeze, with reason or next train, 14 chars each32 chars
company
Label
Company name20 chars
page
Label
Page number4 chars
05

Style Knobs (2)

Title sizefontSize
Aa
font-size44–60px (step 4)
Next train version sizefontSize
Aa
font-size26–40px (step 2)
06

Used in these deck templates

Not used in any deck template yet.